Sign In | Join Free | My wneducation.com |
|
Brand Name : Funcastle
Model Number : HX-CB07
Certification : CE,ISO9001;
Place of Origin : Guangzhou,China
MOQ : 1Set
Price : 120.00USD -220.00USD/Per square meter
Payment Terms : T/T, L/C
Supply Ability : 60 Set /Per Month
Delivery Time : 20-25days
Packaging Details : Plastic and bubble film
Material : Steel frame ,Resin
Size : Customized according to the space
Apply to : School,Shopping mall, amusement center
Age group : adult available
Rocking Holds : Fiberglass,Resin
Rocking Panel : Fiberlass,Resin,Plywood
Product Name : Rock Climbing Wall
Color : Mixed Color or Customized
Professional Fiberglass Climbing Wall Customized Panel For Competition And Training
Feature:
1.Steel frame lean on the wall
2.Rock climbing holds are available to adjust the route on the climbing wall
3.The auto belay system for safety control
Product Details:
Name | Professional Fiberglass Climbing Wall Customized Panel |
Size | Every climbing wall different due to the space situation |
Advantage |
|
Material | Hot galvanized steel frame ,fiberglass panel |
Installation | Easy to install according to the instructions drawings ,and sites engineer support available |
How to arrange shipment for rock climbing wall ?
As we all know that the climbing wall involves the installation ,It consists of steel frame ,panel ,rocking holds and safety belay system .These components are not the standard packing as a box ,especially for steel frame .In this way ,How to arrange shipment for rocking climbing wall ?
The direct way is to order a small container for all rock climbing equipment ,this way can load all items ,included the steel frame .but this will cause some space wasted in the container ,as the steel frame not packing standard .But if the space is big ,then normally it can load a full container .
The another way is to order panels and other components which will be packed properly ,but leave the steel frame install in local .If by this way ,The rock climbing wall equipment are suitable consolidated with other goods ,then the ocean cost will be less .
The point is that if clients have the way to do the steel frame in local ,then order the panels and other components is one of the way to save cost .but if the space is bigger ,also there are much goods for other equipment ,loading a full container is the best choice .
![]() |
ODM Rock Climbing Wall Playground Equipment , Climbing Wall For Kids Images |